Page 20 - BIM and ISO 19650 from a project management perspective
P. 20

It is important to note that Figure 6 shows project closure happening differently:

                                  • where a contract is design only
                                  • where a contract includes works supervision, i.e. usually between the client, the consulting engineer and the contractor
                                  • where a contract includes the handover

                          Figure 6, below, shows the relationship between these three parties: client, consulting engineer and contractor. However, each
                          country treats work breakdowns structures differently and they should be developed accordingly.

                          With Figure 6, ISO 19650 - Part 2 strongly recommends the client to prepare the tender process by specifying in the tender
                          documentation its requirement for the information delivery process. Consulting engineers should note the impact on the tender
                          documentation (Stage 3) i.e. the BEP is prepared during the bidding process in order to have a clear understanding between the
                          appointing and appointed party, before the commencement of the project.
















                          KEY
                          1.1   appoint individuals to undertake the information management function
                          1.2   establish the project’s information requirements
                          1.3   establish the project’s information delivery milestones
                          1.4   establish the project’s information standard
                          1.5   establish the project’s information production methods and procedures
                          1.6   establish the project’s reference information and shared resources
                          1.7   establish the project’s common data environment
                          1.8   establish the project’s information protocol
                          A   information model progressed by subsequent delivery team(s) for each appointment
                          NOTE  Activities shown in parallel are to highlight that these activities can be undertaken concurrently and apply to all instances


       20                 Figure 6:  Information delivery Stage 1 – assessment and need, according to ISO 19650 - Part 2
   15   16   17   18   19   20   21   22   23   24   25